STANDALONE CONSULTANCY SERVICE
Manufacturing and Workflow Review
Find where work gets held up and decide what to fix first. We’ll follow a real job through one workflow and turn what we learn into a short action plan your team can use.
Enquire about a workflow review
Where is work getting held up?
Choose one part of your operation to review, from the first enquiry through to production and handover.
- Quotes stall while the team chases drawings, specifications or costs.
- Jobs queue at the same workstation or keep coming back for rework.
- Production starts before the team has the latest drawings or approvals.
How the review works
- 01 / AGREE THE FOCUS
Choose one workflow.
We’ll start with a short introductory call and agree where the review begins and ends.
- 02 / FOLLOW THE WORK
See how a real job moves.
I’ll talk to the people involved and look at the records they use, where jobs wait, and how information passes between teams. We can work on site or remotely, depending on the workflow.
- 03 / PLAN THE NEXT STEPS
Get a short action plan.
You’ll get a summary of the bottlenecks, what to tackle first, and practical steps your team can take. You can use the plan yourself or arrange help putting it into practice.
Read the illustrative manufacturing case study
Discuss your workflow
SAMPLE DELIVERABLE / FICTIONAL JOB
A one-page workflow action plan
See what you could take back to your team after a Manufacturing and Workflow Review.
Storage cabinet batch · Job DEMO-024
Scope — Drawing approval to CNC setup.
- Bottleneck
- CNC setup stopped while the operator confirmed which drawing revision to use. The job pack held two versions and neither was marked as released.
- Recommended change
- Before scheduling CNC work, attach the approved drawing to the job record and mark the revision on the job sheet. Keep the job on hold if the revision is missing or the two records disagree.
- Action owner
- The production planner owns the release check. The drawing lead confirms the revision and the CNC operator flags any mismatch before setup.
- How to check it worked
- Pilot the check on the next five cabinet jobs. Record the released revision and any setup delay caused by a drawing query. Compare with the previous five comparable jobs where records are available. Aim for five matching revisions and zero drawing-related setup delays. Review any exceptions with the production planner.
Tell me what you’d like to improve
A short description of where jobs get held up is enough to start.