ILLUSTRATIVE EXAMPLE / DOORSET MANUFACTURING
From quotation to shop-floor release
A doorset job reaches the shop floor with an agreed quotation but gaps in the information needed to start. Here’s how a clearer handover and first-off inspection could help the team decide when to release the batch.
What changes on the shop floor
- 01 / THE GAP
The team has to stop and ask.
The quotation describes the doorset, but the job pack lacks a confirmed drawing revision and leaves the frame profile and hardware preparation unclear. The supervisor pauses setup while the office confirms what was agreed.
- 02 / THE HANDOVER
Release one checked job pack.
Link the accepted quotation to the current drawing, component schedule, profile reference and hardware preparation details. Give unresolved items an owner and hold the job until the responsible reviewer clears them.
- 03 / THE FIRST-OFF CHECK
Check the first unit before releasing the batch.
Compare the first unit’s dimensions, frame profile and machining positions against the released drawing. Record the result and reviewer. If a check fails, hold the batch, correct the setup and inspect a new first unit before release.
The handover record shows which revision production received and who cleared any open items. The inspection record shows what was checked and who authorised the batch to proceed.